We are thinking to upgrade to Board 14 and I would like to have the community feedback about this. We are under 12.6 version.
Have you tested every single functionality before doing your upgrade to production ?
We were thinking about upgrading our dev environnement, developping our evolutions and testing them on it, thus covering the upgrade testing in the same time during 2 or 3 months. But I was wondering if the transport package is working fine between an environnemnt under version 14 and another under 12.6 where we would do our final testing.