Raise the limit of Custom Time Entities on Time Range
Main Idea: Today, the number of Custom Time Entities is limited to 4. My idea would be to raise this limit number to at least 10. It would be great to have no limit, if possible. The last project I worked on lasted 40 days. If I had a free custom time entity, I could have saved around 3 to 4 days of work, which is a…
-
Ability to type in Row number to view in Data Reader ETL
Hi, I was creating a Data Reader with an ETL in the Validation Condition and wanted to scan across the file to view another row that had a different "Stock Source" to confirm that my formula was working correctly, but I had to manually flick between the rows. It'd be nice to, e.g., input row "200" as a text field in the…
-
Add ability to multi-select columns in Block Format
Block formatting individual columns is a very time consuming job, and this would allow you to speed up the process a lot faster. You can currently multi select on the different rows, but it'd be very beneficial to CTRL+Left Click on the columns to format them together too. There are data views with over 100+ columns here…
-
Rest API call manual script
With the new 'Rest API call' action, it is possible to connect and download data from a public or authorized API into a CSV/JSON file through a list of mapped parameters. Even though, you have the possibility to see how the query has been structured in the 12.6 release, you cannot edit it. It could be useful to interact…
-
Debugging training
Hi all, In many occasions new BOARD developers/consultants don't start a project from scratch, they start from an already built solution and they need to solve issues or to evolve it. From my point of view, the "debugging" is as important as the construction, so I ask for an specific training in the academy with the…
-
Rest API: Additional output/storage formats for REST API call (e.g. temporary cube)
The only output format (right now) for an REST API call is to save it to an CSV file. This CSV file can be used to load an temporary cube. A direct load (without saving the file to disk) into a cube / temporary cube would be a great enhancement.
-
Temporary Entity
Just like we have temporary cubes in procedures sometime we need dummy entites of one or two members may be more depending upon calculations, so like temporary cubes how about having temporary entites??
-
Impact Analysis - Stop Pre-analysis
Impact analysis is a very powerful feature. The bigger a data model is, the more important are the insights that can be gained with it. At the beginning, a pre-analysis is performed to offer only available analyses to the user. For very large applications, this is very time consuming. In this example, it takes almost 5…
-
"Run as administrator" option for "Advanced broadcast rule"
From my point of you it would make sense if there would also be a "Run as administrator" option for the broadcast function "Advanced broadcast rule" so that the developer can explicitly run the broadcast function without (previously removed) security selections. Right now there is no such option so the broadcast function/…
-
Automation possibilty for "Sparsity Optimization"
We very much appreciate the new sparsity optimization feature that makes manual export/import obsolete. It would be great if this function could also be automated. There are use cases in which plan data is cleared or zeroed out again, for example, but the sparsity remains full. Therefore, it would be very helpful if the…
-
Do not replicate entities when we flatten the entities by row
When we have multiple entities by row and we flatten at a certain level, we would like not to replicate the members of an entity and merge the cells with this entity, as in the image attached.
-
Fix the duration in the Gantt-Chart (its off by 1 day)
Hi, it seems like the automatic calculation of the duration, which one can enable in the settings of the Gantt-Chart, is wrong by one day. For example, the duration for an activity from the 10.1.2023 to the 13.01.2023 is shown as 3 days, while in reality there are 4 days: 10,11,12,13. I assume it just calculates…
-
Saving Time Function Forecast in a cube
Hi everyone. I'm interested in using the Forecast function in a cube that contains information about the sales amount until the past month, in order to obtain a prediction for the following ones. Currently I'm applying this Forecast function inside a dataview, the problem is that it takes too long to load the page. Is it…